Advantage/Notice
- All working steps can be carried out on one day
- Due to the integrated check valve no injection material may run back through the packer
- The thrust piece can be removed directly after the injection
- The borehole can be sealed with appropriate material
- The sealing system keeps the clamping rubber tensioned
- Opening pressure approx. 10 - 15 bar
Material to be used
- 1C injection resin
- epoxy resin
- polyurethane
- quick-foaming polyurethane
- 2C injection resin
- 2C polyurethane
Accessories
3 Show Variants
8 Show Variants
7 Show Variants